Blog/Tally workflow
The material arrived. The decision hasn't.

The GRN says received. Quality says rejected.

Stores counted the boxes. Inspection stopped part of the lot. If AP sees only the GRN total, the payment file can look complete while the material decision is still open.

The second signature changes the file

Imagine a fictional delivery of 100 castings. Stores records 100 received. Inspection accepts 84 and puts 16 on hold for a dimensional check. The supplier's invoice bills 100. Every document can be accurately written and the payment decision can still be unresolved.

This is not the same problem as a short delivery. The 16 did arrive. What remains uncertain is whether the factory accepts them, returns them, asks for rework or agrees another settlement. AP needs that decision, not a quieter version of the GRN.

I would keep the received quantity and inspection status side by side. Replacing received 100 with accepted 84 destroys one fact to display another. Both facts matter when the supplier asks where the remaining material went.

Receipt versus acceptance

A GRN records receipt under your process. A quality record may separately establish whether material is accepted, quarantined or rejected. Four-way matching adds inspection evidence to the PO, receipt and invoice comparison. It does not dictate a universal payment rule; contract terms and authorised commercial decisions still govern settlement.

Our PO/GRN matching article covers ordered, received and billed quantities. This page adds the physical acceptance question. It is an operational control you can adopt, not a claim that every factory must use the same form.

Quarantine isn't the same as a return

A quarantined lot may be awaiting a test result. A rejected lot has a different status. A returned lot has physically left the factory with supporting movement evidence. Do not put all three into a column called short supply.

The fictional 100-casting lotSeparate quantity states
RECEIVED
100 castings at the gate
GRN is retained unchanged
ACCEPTED
84 released by inspection
Reference the quality record
ON HOLD
16 awaiting a decision
Not yet a completed return or agreed credit

The example does not instruct AP to pay 84. It identifies the facts needed for an authorised settlement.

If inspection later accepts those 16, add the release reference. If it rejects them, retain the rejection details and the supplier response. The file should show the transition rather than replacing yesterday's state without explanation.

A partial lot needs item-level identity. “Sixteen rejected” is not enough if the delivery contains different grades or casting sizes. Keep the PO line, batch or item reference that lets purchase and the supplier identify the affected material.

That is why a copied invoice quantity cannot settle the quality question. Even a perfect transcription only establishes what the supplier billed. It cannot establish what passed inspection.

The material might be accepted under concession or subject to an agreed price reduction. Those are commercial decisions. AP should obtain the authorised record rather than infer the settlement from an inspection remark.

Who has to resolve the exception?

Quality owns the inspection finding under your process. Purchase normally owns the supplier discussion and the agreed commercial response. Stores records the material movement. AP keeps the payable record linked to those decisions.

Make the next action specific. “Pending purchase” is a label. “Purchase to obtain supplier agreement on rework for batch R7” identifies something that can be completed. Attach the relevant rejection or test report.

The supplier may dispute the result. Keep that disagreement visible. A payment hold is not proof that the supplier accepted a deduction, and a debit note your company raises is not automatically the same thing as the supplier's GST credit note.

For a replacement, identify whether the supplier is replacing rejected goods, completing a short supply or making a new sale. The paperwork and accounting implications can differ. Do not create a second positive purchase merely because another lorry arrives.

The credit-note guide and supplier debit-note guide explain why adjustment documents need their own interpretation. Route the actual document through the correct reviewed process rather than fitting every paper into a purchase-invoice slot.

If return movement needs a challan or other document, retain it in the same file. Tax and movement requirements should be checked against the applicable law and your transaction. The operational status “returned” is not a substitute for evidence that the return happened.

Release payment against the decision, not the loudest email

Build a working card with received quantity, quality status, the billed quantity and the approved settlement outcome. Keep the contract or PO terms that support the decision. There is no universal rule that AP must always pay the smallest number on those documents.

StatusWhat AP still needs
Inspection pendingNamed owner and expected next decision
Rejected, still on siteSupplier response and authorised disposition
ReturnedMovement evidence and adjustment trail
Accepted under concessionApproved commercial terms and tax/accounting review

When the approved outcome reaches treasury, describe what is being settled. If the payment excludes a disputed amount, retain the agreement or the fact that the dispute remains open. Don't call it a discount because that makes the remittance look friendlier.

Keep the invoice payable and the credit expectation distinguishable. An expected supplier credit that never arrives should remain visible in statement reconciliation, not vanish inside a reduced invoice total.

Where a relevant micro or small supplier is involved, the acceptance and objection trail can also matter to payment-law review. Get the applicable treatment checked; an internal quality hold is not automatically a legal exemption from payment obligations.

The invoice gate hasn't met your inspector

EntryLedger checks the extracted invoice document. It does not perform PO/GRN matching, read your test results or decide quality acceptance. A bill can pass checksum and arithmetic while the factory legitimately disputes the material.

Human confirmation in the console prepares the reviewed entry for export. It is not the inspector's sign-off or a payment authority. Keep your own approval responsibilities intact rather than treating a prepared status as permission to pay.

The Tally XML preview also does not prove that the inventory or payable result landed correctly in Tally. Actual import and report qualification remain unverified. Review the destination workflow using the appropriate Tally documentation.

For the next disputed lot, ask AP to show the received record and the current quality decision without editing either one away. The file should explain where the goods are and what the factory has agreed to do about them.

Sources and scope
  • EntryLedger
    Document checks

    A passing invoice is not proof of receipt, quality acceptance or payment approval.

  • CBIC
    Applicable GST provisions

    Return and adjustment requirements depend on the actual transaction.

  • Tally Help
    Import documentation

    EntryLedger matching, inventory import and actual Tally qualification are not claimed.

Frequently asked questions
Does a GRN always mean the goods passed quality?+

No. Your process may distinguish physical receipt from inspection or final acceptance. Keep both records. A quantity entered at the gate does not automatically establish that the material was released for use.

Should AP always pay only the accepted quantity?+

Not as a universal rule. Payment depends on the contract and authorised commercial outcome. Use the quality evidence to obtain that decision, and retain any agreed return, replacement, concession or disputed amount.

Can I change the invoice quantity to the accepted quantity?+

Do not rewrite a correct transcription merely to make the matching screen agree. Preserve what the supplier billed and record the receipt, quality finding and approved adjustment separately. Correct source-reading errors as a different operation.

Does EntryLedger perform four-way matching?+

No. EntryLedger validates extracted invoice information. The PO, receipt, inspection and payment decisions remain in your factory workflow. Confirming an entry prepares it for export; it does not approve material or authorise payment.

Keep the billed quantity faithful to the source

Try invoice review. Bring the quality decision and approved settlement alongside the bill, not inside a rewritten reading.